Research reading
Electric generating sets: wind-powered, (excluding those with spark-ignition or compression-ignition internal combustion piston engines) demand and the South Africa (ZAF) to Ethiopia (ETH) lane
Ethiopia (ETH) reported $1.6M of electric generating sets: wind-powered, (excluding those with spark-ignition or compression-ignition internal combustion piston engines) imports in 2019. South Africa (ZAF) accounted for 0% of the observed market and reported $120.7 in exports on this lane.
The latest annual values eased slightly, while the longer available history shows +14.3% buyer growth and +8.6% exporter growth. The page separates reported values from projections and indicators.
