Research reading
Turbines: hydraulic turbines and water wheels, of a power exceeding 1000kW but not exceeding 10000kW demand and the Slovenia (SVN) to Rwanda (RWA) lane
Rwanda (RWA) reported $1.8M of turbines: hydraulic turbines and water wheels, of a power exceeding 1000kw but not exceeding 10000kw imports in 2020. Slovenia (SVN) accounted for 29.1% of the observed market and reported $673.4K in exports on this lane.
The latest annual values eased slightly, while the longer available history shows +96.8% buyer growth and -8.1% exporter growth. The page separates reported values from projections and indicators.
